EasyManuals Logo

Carrier 59SP5A User Manual

Carrier 59SP5A
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
59SP5A
Single Stage 4---Way Multipoise Gas Furnace
Series 100
Installation, Start---up, Operating and
Se rvice and Maint enance Ins t r uct io ns
NOTE: Read the entire instruction manual before starting the
installation.
SAFETY CONSIDERATIONS 3.........................
INTRODUCTION 4...................................
CODES AND STANDARDS 4...........................
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS 4...
ACCESSORIES 5.....................................
LOCATION 8........................................
General 8.........................................
AIR FOR COMBUSTION AND VENTILATION 9..........
Introduction 9.....................................
CONDENSATE TRAP 12...............................
Upflow 12........................................
Downflow 12.....................................
Horizontal 14.....................................
CONDENSATE DRAIN 17.............................
INSTALLATION 19...................................
Upflow 19........................................
Downflow 19.....................................
Horizontal 20......................................
Filter Arrangement 21...............................
AIR DUCTS 27.......................................
General Requirements 27.............................
Ductwork Acoustical Treatment 27.....................
GAS PIPING 28......................................
ELECTRICAL CONNECTIONS 29.......................
115--V Wiring 29...................................
J--Box Installation 30................................
24--V Wiring 30....................................
Accessories 30.....................................
Alternate Power Supplies 30..........................
VENTING 36........................................
Special Venting Requirements for Installations in Canada 36.
General 36........................................
Materials 37.......................................
Venting Systems 37.................................
Locating the Vent Termination 37......................
Combustion Air and Vent Piping Insulation Guidelines 38...
START--UP, ADJUSTMENT, AND SAFETY CHECK 56......
General 56.........................................
Prime Condensate Trap 56.............................
Purge Gas Lines 56...................................
Adjustments 56......................................
SERVICE AND MAINTENANCE PROCEDURES 64........
Cleaning Heat Exchangers 69...........................
SEQUENCE OF OPERATION 73........................
PARTS REPLACEMENT GUIDE 78......................
TABLES
Loose Parts Bag 5.....................................
Minimum Clearances to Combustible Materials 5.............
Minimum Free Area Required 11.........................
Minimum Space Volumes 11.............................
Filter Size Information 21...............................
Opening Dimensions 23................................
Air Delivery CFM 27...................................
Maximum Capacity of Pipe 29...........................
Electrical Data 31......................................
Vent Termination Kit for Direct Vent (2--Pipe) System 37.......
Combustion--Air Vent Pipe, Fitting & Cement Material.. 42.....
Maximum Allowable Exposed Vent Lengths Insulation 43......
Maximum Equivalent Vent Length 43......................
Deductions from Maximum Equivalent Vent Length 43........
Blower Speed Taps 58..................................
Blower Off Delay Setup Switch 58........................
Altitude Derate Multiplier for U.S.A. 59....................
Gas Rate 61..........................................
Orifice Size and Manifold Pressure 62.....................
CERTIFIED
Always Ask For
Use of the AHRI Certified
TM Mark indicates a
manufacturer’s
participation in the
program For verification
of certification for individual
products, go to
www.ahridirectory.org.
Portions of the text and tables are reprinted from NFPA 54/ANSI
Z223.1--2009E, with permission of National Fire Protection
Association, Quincy, MA 02269 and American Gas Association,
Washington DC 20001. This reprinted material is not the complete
and official position of the NFPA or ANSI on the referenced
subject, which is represented only by the standard in its entirety.

Other manuals for Carrier 59SP5A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Carrier 59SP5A and is the answer not in the manual?

Carrier 59SP5A Specifications

General IconGeneral
BrandCarrier
Model59SP5A
CategoryFurnace
LanguageEnglish

Related product manuals