EasyManuals Logo
Home>Delta>Plumbing Product>MultiChoice 13/14 Series

Delta MultiChoice 13/14 Series User Manual

Delta MultiChoice 13/14 Series
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
13 / 14 Series Installation
1
Cartridge Installation
A.
C.
Turn off water supplies. Remove
cover (1), bonnet nut (2) and test cap (3)
from the body. If this is not a thin wall
mounting, the entire plasterguard (4)
may be removed. If screen (5) is in place,
remove before installing cartridge.
For back to back or reverse installations
(hot on right and cold on left) insert the
cartridge with the “hot side” on the right.
If you are not making a reverse or back
to back installation skip this step and
continue with step 1C.
Slide bonnet nut (1) over the cartridge
and thread onto the body. Hand tighten
securely.
B.
Rotate the cartridge (1) so the words
“hot side” (2) appear on the left. Insert
cartridge into valve body as shown. Make
sure the cartridge tubes and O-rings (3)
are properly seated in holes at the base of
the body. Ensure the keys on the body are
fully engaged with the slots in the body (4).
Back to back Installation
Normal Installation (changes not required)
Reverse
Installation
Cold
Hot
1
2
3
1
4
4
2
3
1
3
5
4

Other manuals for Delta MultiChoice 13/14 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta MultiChoice 13/14 Series and is the answer not in the manual?

Delta MultiChoice 13/14 Series Specifications

General IconGeneral
BrandDelta
ModelMultiChoice 13/14 Series
CategoryPlumbing Product
LanguageEnglish

Related product manuals