EasyManua.ls Logo

Desmi S100-80-175N/A-D11 User Manual

Default Icon
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
OPERATION AND MAINTENANCE INSTRUCTIONS
DESMI self-priming centrifugal pump
Modular S-N Super Bilge Pump
DESMI Pumping Technology A/S
Tagholm 1 DK-9400 Nørresundby Denmark
Tel.:
+45 96 32 81 11
Fax:
+45 98 17 54 99
E-mail:
desmi@desmi.com
Internet:
www.desmi.com
Manual:
T1444
Language
English
Revision:
F (11/19)
Question and Answer IconNeed help?

Do you have a question about the Desmi S100-80-175N/A-D11 and is the answer not in the manual?

Desmi S100-80-175N/A-D11 Specifications

General IconGeneral
ModelS100-80-175N/A-D11
CategoryWater Pump
Pump Size100-80-175
Impeller diameter175 mm
MaterialCast iron
SpeedUp to 2900 rpm
Pump TypeCentrifugal
Discharge connection80 mm

Summary

Product Description

Delivery

Check delivery for completeness and undamaged condition, reporting issues to carrier and supplier.

Technical Data

Name Plate

Details on manufacturer, contact info, and pump identification codes like type, code, and serial numbers.

Explanation of the Type Number

Breakdown of the pump's type number, explaining codes for size, material, and assembly combinations.

Technical Description

Information on pump noise levels, capacity indication, and permissible flange loads.

Installation

Mounting/Fastening

Instructions for mounting the pump on a solid base plate, ensuring horizontal shaft alignment and observing flange loads.

Wiring

Guidance that wiring must be performed by authorized skilled workmen according to regulations.

Transport/Storage

Dismantling

Access to Impeller

Steps to access the impeller by removing U-pipe, shaft seal cover, and bearing housing.

Dismantling Impeller and Star Wheel

Procedure for removing the impeller, priming plate, and star wheel using specified screws and nuts.

Dismantling Shaft Seal

Steps for removing the shaft seal, including withdrawing the sunk key and separating housing parts.

Dismantling Seat

Instructions for pressing out the seat from behind the shaft seal.

Dismantling Shaft with Bearings

Process to remove the shaft and bearings after withdrawing the sunk key for inspection.

Inspection

Guidelines for checking parts like sealing rings, shaft seals, bearings, and star wheels for wear and damage.

Assembling

Fitting Sealing Ring in Pump Casing

Instructions for fitting the sealing ring so it bears against the pump casing shoulder.

Fitting Shaft with Bearings

Steps for leading the shaft with bearings into the housing and fitting the sunk key.

Fitting Water Deflector

Procedure for assembling the bearing housing and shaft seal cover, then fitting the water deflector.

Fitting Shaft Seal

Detailed steps for fitting the shaft seal, including cleaning, lubrication, and using fitting tools.

Fitting Star Wheel

Instructions for fitting the star wheel, checking clearances, and securing it with a pointed screw.

Fitting Impeller

Procedure for fitting the impeller onto the shaft, ensuring correct spring location and securing with washer and nut.

Fitting Bearing Housing and Shaft Seal Cover

Steps for placing gasket and O-ring, then fitting the bearing housing and shaft seal cover assembly.

Shaft

Final check to ensure the shaft rotates freely after assembly.

Frost Protection

Dismantling

Start-Up

Starting

Pre-start checks for shaft rotation and pump casing filling, followed by brief run for direction check.

System Balancing

Inspection and Maintenance

Draining the Pump

Instructions for draining the pump by removing the drain plug after the piping system is empty.

Bearings

Information on bearing life, lubrication, and replacement criteria based on noise or wear.

Repairs

Ordering Spare Parts

Requirement to state pump type and number when ordering spare parts.

Operating Data

EC Declaration of Conformity

Information Relevant for Disassembly or Disposal at End-of-Life

Assembly Drawing

Spare Parts List

Dimensional Sketch

Related product manuals