EasyManuals Logo
Home>GE>Cooktop>JCP340

GE JCP340 Installation Instructions

GE JCP340
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TOOLS YOU WILL NEED
CAUTION:
BEFORE YOU BEGIN
Read these instructions carefully and completely.
IMPORTANT – Save these instructions for local
inspector’s use.
IMPORTANT – Observe all governing codes and
ordinances.
Note to Installer – Be sure to leave these instructions with
the Consumer.
Note to Consumer – Keep these instructions for future
reference.
30” Electric Cooktop
Installation
Instructions
JCP910, JCP930
NOTE: This appliance must be properly grounded.
Skill level – Installation of this appliance requires basic
mechanical and electrical skills.
Completion time – 2–3 hours.
Proper installation is the responsibility of the installer.
Product failure due to improper installation is not
covered under the Warranty.
PARTS INCLUDED
1/8” Drill Bit and
Electric or Hand Drill
Phillips
Screwdriver
Foam Strips
4 screws
Pub. No. 31-10602
01-05 JR
Printed in the United States
1
Questions? Call 1.800.361.3400 or visit our Website at: www.GEAppliances.ca
2 Hold Down Brackets
Ruler or
Straightedge
Hand or
Saber Saw
Pencil
Junction
Box
Wire Nuts
MATERIALS NEEDED

Other manuals for GE JCP340

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE JCP340 and is the answer not in the manual?

GE JCP340 Specifications

General IconGeneral
BrandGE
ModelJCP340
CategoryCooktop
LanguageEnglish

Related product manuals