EasyManuals Logo

GE JKP20 Installation Instructions

GE JKP20
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background image
Installation Instructions
[_ Pre-lnstallation Checklistcont.
[_ lace the oven on a table or platform
even with the cutout opening.
(Platform must support 150 Ibs. single,
275 Ibs. double.)
Remove the bottom trim from the top
of the oven. It will be installed at the
end of the installation process. The
trim is wrapped separately and taped
to the top of the unit.

Other manuals for GE JKP20

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE JKP20 and is the answer not in the manual?

GE JKP20 Specifications

General IconGeneral
BrandGE
ModelJKP20
CategoryOven
LanguageEnglish

Related product manuals