Ultrasound System – Common Service Information Index-1
Direction 5444964-100 English Rev. 5
Index
A
acclimate time, 3-3
B
before installation (site preparations), 3-1
C
cable inspection
mains cable inspection, 4-8
Care and Maintenance, 4-2
care and maintenance, 4-1
warnings, 4-3
CE compliance, 2-22
chassis leakage current test, 4-25
cold or hot
if the ultrasound system is very cold or hot, 3-3
compliance, 2-22
conventions used in book, 2-3
cooling, 3-4
copyrights, i-17
D
dangerous procedure warnings, 2-19
desirable features, 3-25
E
electrical requirements, 3-5, 3-17
EMI limitations, 3-18
general ultrasound system requirements, 3-5
requirements for the ultrasound system, 3-5
site circuit breaker
site circuit breaker, 3-17
site power outlets
site power outlets, 3-17
electrical safety, 2-16
electrical safety tests, 4-14
electromagnetic compatibility (EMC), 2-22
electromagnetic interference
abatement, 3-19
prevention, 3-19
electrostatic discharge prevention, 2-23
EMC
compliance, 2-22
electromagnetic compatibility, 2-22
what is EMC?, 2-22
EMI
abatement, 3-19
prevention, 3-19
EMI limitations, 3-18
environmental requirements, 3-3
environmental specifications
for ultrasound system, 3-4
EQC
ultrasound equipment quality check, 4-46
errors, i-16
ESD prevention, 2-23
F
facility needs, 3-21
desirable features, 3-25
purchaser responsibilities, 3-21
required facility needs, 3-23
functional checks, 4-7
mains cable inspection, 4-8
G
general ultrasound system requirements, 3-3
electrical requirements, 3-5
generic procedure on probe leakage current, 4-36
grounding continuity, 4-24
H
hot or cold
if the ultrasound system is very cold or hot, 3-3
how often should maintenance tasks be performed?,
4-5
human safety, 2-8
I
icons, 2-3
icons indicating a special procedure to be used, 2-6
if the ultrasound system is very cold or hot, 3-3
important precautions, i-2
isolated patient lead (source)
leakage lead to ground, 4-29
leakage lead to lead, 4-31