GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-173
Section 8-54
Functional Checks after FRU replacement (Debrief Guidelines)
1.) Perform required Functional and/or Leakage Current tests based upon the FRU being replaced.
2.) Clarify the scripts to debrief a Service Dispatch using your pole's dispatch tool.
Use this script in the Service Comments when debriefing a Service Dispatch.
For a replaced FRU, use the following debrief script:
Proprietary Service Manual, Voluson™ P8 / Voluson™ P6, Revision Voluson™ P8 / Voluson™ P6,
Section [fill in appropriate section]. Equipment passed all required tests and is ready for use.
And, if testing leaking current, use the following text.
Proprietary Service Manual, Voluson™ P8 / Voluson™ P6, Revision Voluson™ P8 / Voluson™
P6, Section [fill in appropriate section]. Leakage Current meets allowable limits. Equipment
passed all required tests and is ready for us.