58
PMEN0643 rev.0 - 04/2023
8
BEFOREOPERATION
COMMISSIONING
8.1 Before operaon
! CAUTION
• Supply electrical power to the system for approximately 12 hours before start-up aer a long
shut-o. Do not start the system immediately aer power supply, it may cause compressor
failure because the compressor is not well-heated.
• When the system is started aer a shut-o longer than approximately 3 months, it is
recommended that the system be checked by your service contractor.
• Turn OFF the main switch when the system is to be stopped for a long period of me: as the oil
heater is always energized even when the compressor is not working, there will be electricity
consumpon unless the main switch is turned OFF.
8.2 Preliminary check
When installaon is complete, perform commissioning according to the following procedure, and
hand over the system to the customer. Perform the commissioning of the units methodically, and
check that the electrical wiring and the piping are correctly connected.
Indoor and outdoor units must be congured by the installer to get the perfect seng and the unit
working.
NOTE
For the commissioning of the outdoor unit please refer to the outdoor unit installaon and
operaon manual.
8.2.1 Checking the unit
• Check external appearance of the unit to look for any damage due to transportaon or
installaon.
• Check that all the covers are totally closed.
• Check that the recommended service space is respected (see Service space chapter in the
Indoor unit Instrucon manual and the outdoor unit Installaon and operaon manual).
• Check that the unit has been correctly installed onto the wall.
8.2.2 Electrical checking
! CAUTION
Do not operate the system unl all the check points have been cleared:
• Check to ensure that the electrical resistance is more than 1 MΩ, by measuring the resistance
between ground and electrical parts terminal. If not, do not operate the system unl the
electrical leakage is found and repaired. Do not impress the voltage on the terminals for
transmission and sensors .