EasyManuals Logo
Home>IBC>Boiler>SFC-99

IBC SFC-99 User Manual

IBC SFC-99
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
INSTALLATION AND OPERATION INSTRUCTIONS
1-12
SFC COMBI BOILERS SFC-99, SFC-125
You must follow the installation instructions, clearances and wall thickness
requirements recommended of the approved vent termination manufacturer.
Approved Side Wall Termination Kits are listed below: (Alternative vent
termination kits must be submitted to IBC for approval prior to installation.)
Ipex - #196984 – 2" PVC low prole termination kit
Ipex - #196985 – 3" PVC low prole termination kit
Figure 10: Non-Concentric kits - Ipex #196984 2” PVC and #196985 3” PVC
Figure 11a: Horizontal Concentric Termination - Two Kits
Figure 11b: Horizontal Concentric Termination - Single Kit
WARNING
The vent for this appliance
must not terminate:
1. Over public walkways.
2. Near soft vents or crawl
space vents or other areas
where condensate or vapor
could create a nuisance or
hazard or cause property
damage.
3. Wherever condensate
vapor could cause damage
or could be detrimental to the
operation of regulators, relief
valves, or to other equipment.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBC SFC-99 and is the answer not in the manual?

IBC SFC-99 Specifications

General IconGeneral
BrandIBC
ModelSFC-99
CategoryBoiler
LanguageEnglish

Related product manuals