EasyManuals Logo
Home>Kohler>Marine Equipment>5-10EKD

Kohler 5-10EKD Installation Instructions

Kohler 5-10EKD
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TT-1715 2/17
INSTALLATION INSTRUCTIONS
Original Issue Date: 2/17
Model: 5--10EKD/4--8EFKD, 6EKOD/5EFKOD, 9--11EKOZD/7--9EFKOZD
Market: Marine
Subject: Two-Inch (NMEA 2000) Digital Gauge Kit GM96999-KP1
Introduction
The remote two-inch digital gauge has controls that
allow starting, stopping, resetting select faults, and
monitoring of generator set functions The two-inch
remote digital gauge can be used with the marine
generator models/controllers shown in Figure 1. See
Figure 2 for the remote digital gauge.
Model Controller Kit Number
5--10EKD
4--8EFKD
ADC II
GM96999-KP1
6EKOD
5EFKOD
ADC IId
9--11EKOZD
7 --9EFKOZD
Figure 1 Kit Number for Model with Controller Type
1
2
3
1. START (up) arrow button
2. MODE button
3. STOP (down) arrow button
4. LCD display
4
Figure 2 Gauge Pushbuttons
The gauge communicates with the generator set
model(s) listed above. A 12-pin customer-interface
connector allows connection from the gauge to the
generator set.
Note: Read the entire installation procedure including
safety precautions before beginning installation.
Perform the steps in the order shown.
The current software versions are located in TechTools
on the Kohler Power Resource Center. Access the
TechTools site to update the controller software to the
versionindicatedinFigure3.
Model Controller Software Version
5--10EKD
4--8EFKD
ADC II 1.8.4
6EKOD
5EFKOD
ADC IId 4.4.0
9--11EKOZD
7 --9EFKOZD
Figure 3 Controller Software Updates
Safety Precautions
Observe the following safety precautions while installing
and operating the gauge.
Accidental starting.
Can cause severe injury or death.
Disconnect the battery cables before
working on the generator set.
Remove the negative (--) lead first
when disconnecting the battery.
Reconnect the negative (--) lead last
when reconnecting the battery.
WARNING
Disabling the generator set. Accidental starting can
cause severe injury or death. Before working on the
generator set or equipment connected to the set, disable the
generator set as follows: (1) Move the generator set master
switch to the OFF position. (2) Disconnect the power to the
battery charger. (3) Remove the battery cables, negative (--)
lead first. Reconnect the negative (--) lead last when
reconnecting the battery. Follow these precautions to prevent
starting of the generator set by an automatic transfer switch,
remote start/stop switch, or engine start command from a
remote computer.

Other manuals for Kohler 5-10EKD

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler 5-10EKD and is the answer not in the manual?

Kohler 5-10EKD Specifications

General IconGeneral
BrandKohler
Model5-10EKD
CategoryMarine Equipment
LanguageEnglish

Related product manuals