KWP
Contents
Point no.Description Page no.
1 General 1
1.1 Handling 1
2 Installation 1
2.1 Foundation 1
2.2 Base frame and pump 1
2.3 Alignment of pump and driver 1
2.4 Connecting the piping 1
2.4.1 Auxillary connections 2
2.4.2 Vacuum balance line 2
2.5 Coupling guard 2
2.6 Measuring instruments 2
2.7 Final check 2
3 Commissioning, start up shut down 2
3.1 Preliminary remarks regarding commissioning 2
3.1.1 lubricants 2
3.1.2 Shaft seal 3
3.1.2.1 Stuffing boxes 3
3.1.2.2 Packing the stuffing boxes 3
3.1.2.3 Packing material 3
3.1.2.4 Dimensions of the packing compartment 3
3.1.2.5 Alternate packing arrangements available 4
3.1.2.6 Instructions for stuffing box packing arrangemet 4
3.1.3 Priming the pump 4
3.1.4 checking direction of rotation 4
3.2 Start-up 4
3.3 Shutdown 5
4 Maintenance and lubrication 5
4.1 Supervision of operation 5
4.2 Lubrication and lubricant changes 5
4.2.1 Lubrication 5
4.2.2 Oil changes 5
4.2.2.1 Procedure 5
4.3 Preservation 5
5 Special instructions & recommendations 5
5.1 Dismantling and reassembly 5
5.1.1 General 5
5.1.2 Dismantling 5
5.1.2.1 Standard bearing arrangement 5
5.1.3 Reassembly 6
5.2 Bearings 7
5.3 Spares 7
5.3.1 Ordering spare parts 7
5.3.2 Recommended stock of spare parts 7
for one year of operation
5.3.3 Interchangeability of components 7
5.4 Sectional drawing & list of components 8
5.4.1 Standard bearing assembly 8
6 Faults 10
6.1 faults, causes & remedies 10
6.2 Cause-remedy 10