page 31
Handling Outdoor Units
Please refer to the followings to conduct moving of units; To use 4 supporting point to move units instead of
3 points, to avoid unstable move and units drop off.
≥1000
mm
BACK
FRONT
F
RONT
≥100
0mm
BACK
FRONT
FRONT
≥
9
0
0
m
m
B
ACK
BACK
≥
4
5
0
m
m
BACK
BAC
K
FRONT
FRON
T
BAC
K
FRONT
FRON
T
BACK
≥1000
mm
≥
9
0
0
m
m
≥
4
5
0
m
m
≥
4
5
0
m
m
>8
m
Suspension ropes
<4 0
°
Prote
ctive pads
>8
m
<
40°
(8m or longer × 2 r
opes)
≥1000
mm
BACK
FRONT
F
RONT
≥100
0mm
BACK
FRONT
FRONT
≥
9
0
0
m
m
B
ACK
BACK
≥
4
5
0
m
m
BACK
BAC
K
FRONT
FRON
T
BAC
K
FRON
T
FRON
T
BACK
≥1000
mm
≥
9
0
0
m
m
≥
4
5
0
m
m
≥
4
5
0
m
m
>8
m
Suspension ropes
<4 0
°
Prote
ctive pads
>8
m
<
40°
(8m or longer × 2 r
opes)
Notes:
• Do not tie or move the unit with the package rope, as it is easy to break
and bring danger.
• Do use special rope to tie the units for transportation.
• Do not touch the fins of units to avoid hurt of hand.
• Do keep the plastic bag from the child.
Outdoor Unit Installation
• To use the solid base or supporter to build the basement. Consider the strength of the floor, drainage (the
drainage flows from the unit in operation), and piping layout. If the strength is beyond requirement, the unit
may fall off to damage the unit and injure people.
• To fix the outdoor unit with screw bolt to avoid falling off by earthquake or strong wind.
• To stop vibration transferring to the installation part, the bottom panel and wall, this depends on the
installation condition. Take measures to stop the vibration (such as using cushion blocking or support).
• To place the edge unit correctly. If not, the unstable unit may cause the installation foots bent. Any incorrect
installation may cause the unit falling off and injuring people.
Warning
:
• The installation ground and base must be strong enough to bear the unit weight and vibration.
• Notes for locating lower piping and layout: When locating lower piping and layout, make sure the basement
not block the hole at the bottom. When locating the lower piping, the basic height shall not be less than
100mm, which can ensure the pipe to get through the unit bottom.