EasyManuals Logo
Home>Ninja>Coffee Maker>COFFEE BAR CF091 SERIES

Ninja COFFEE BAR CF091 SERIES Quick Start Guide

Ninja COFFEE BAR CF091 SERIES
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CF09 1 SERIES
HOT OR COLD FROTHING AT YOUR FINGERTIPS
DRIP STOP CLEANUP
For how-to videos and more, visit ninjacoffeebar.com | Questions? 1-877-646-5288
For how-to videos and more, visit ninjacoffeebar.com | Questions? 1-877-646-5288
For how-to videos and more, visit ninjacoffeebar.com | Questions? 1-877-646-5288
The water reservoir lid is removable for
easy cleaning and is dishwasher safe.
1. Add milk to your cup
until it is about
1
3 full.
2. Hold the cup under the
frother and submerge
the whisk just below the
surface of the milk. Froth
for 30–45 seconds.
3. Remove the frother whisk by
twisting clockwise. Keep your
cup below the whisk while
you carry it to your sink or
dishwasher for easy cleaning.
CAN’T WAIT FOR THAT FIRST CUP?
THEN DON’T
Simply close the drip stop to pause the carafe
brew cycle, and then pour your first cup.
Reopen the drip stop to continue the brew.
STOP THE DRIPS AFTER THE BREW
At the end of a brew, close the drip stop to
prevent drops of coffee from escaping.
REMOVABLE BREW BASKET
FOR EASY CLEANUP
To avoid spills and drips, keep the
filter inside the removable brew
basket as you carry it to the trash.
PLUG IN, POWER UP, AND PRE- HEAT
Plug in your brewer, then press the power
button. The PRE-HEATING light will
illuminate for 3 minutes.
When the light goes out,
you’re ready to brew some
steaming hot coffee.
FILLING THE WATER RESERVOIR
PRE-HEAT FOR THE HOTTEST FIRST CUP
FILL TO THE MAX LINE.
Fill to the max line and let Auto-iQ
take it from there.
1
2
BEFORE YOUR
FIRST BREW
Before first use, run two Full Carafe
Clean cycles. With your water reservoir
filled to the max line with fresh water,
your brewer plugged in, and the carafe
in place, press the CLEAN button to
start a cycle.
(Discard the brewed water after each cleaning cycle.)
CAUTION: DO NOT reach across top of brewer to froth during brewing . Steam is released from vent on top of
brewer and can result in a stea m burn .
Please make sure to read the enclosed Ninja
®
Owner’s Guide prior to using your unit.
PRE-HEATING
Pre-heating ensures
your first cup will
be as hot as it
possibly can be.
(But if you don’t
have time to wait,
you can still brew
before pre-heat is
fully activated.)
For hot froth, microwave for
45– 60 seconds.
For cold froth, skip to Step 2.
FOR HOT FR OTH
QUICK START
GUIDE

Other manuals for Ninja COFFEE BAR CF091 SERIES

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ninja COFFEE BAR CF091 SERIES and is the answer not in the manual?

Ninja COFFEE BAR CF091 SERIES Specifications

General IconGeneral
Colorblack/stainless, multi
Coffee Typegrounds
Coffee Strength Controlyes
Built-In Grinderno
Removable Water Tankyes
Single / Multi Servemulti serve
Water Filterno
Programmableyes
Carafeyes
Carafe Capacity10 cups
Warming Plateyes
Removable Drip Trayno
Frotheryes
Filterpermanent
Control Typedial, digital
Power Consumption1450 watts
Voltage120 volts

Related product manuals