d07068.fm
08 February 2024 74-20-00
Initial Issue Page 2 of 15
Copyright - BRP-Rotax GmbH & Co KG. All rights reserved.
SI-912 i-029 / SI-915 i-012
SI-916 i-007
SERVICE INSTRUCTION
1.7) Labor time
Estimated labor hours:
Engine installed in the aircraft - - - labor time will depend on airframe installation and therefore no
estimate is available from the engine manufacturer.
1.8) Mass data
Change of weight - - - none.
Moment of inertia - - - unaffected.
1.9) Electrical load data
No change.
1.10) Software modifications
No change.
1.11) References
In addition to this technical information refer to current issue of
- in general Illustrated Parts Catalog (IPC) and in particular:
Chapter 74-20-00 and 76-50-00.
- in general Operators Manual (OM)
- in general Installation Manual (IM)
- in general Maintenance Manual Line (MML) and in particular:
Chapter 74-20-00 and 76-50-00
- in general Maintenance Manual Heavy (MMH) and in particular:
Chapter 74-20-00 and 76-50-00
NOTE: The status of the Manuals can be determined by checking the table of amendments.
The 1
st
column of this table shows the revision status. Compare this number to the one
listed on the ROTAX website:
www.flyrotax.com. Updates and current revisions can be downloaded for free.
1.12) Other Publications affected
None.
1.13) Interchangeability of parts
- Not affected