5. Removal & Installation of Engine
5-8
Installation of Engine
Install the engine according to the reversing order
of removal.
Caution
z Note both feet and hands safety for
squeezing as engine installation.
z Do not bent or squeeze each wires or hose.
z Route all cables and wires in accordance with
the routine layout.
Engine hanger nut:
Torque Value: 4.5~5.5kgf-m
Rear cushion bolt:
Torque Value: upper:3.5~4.5kgf-m
under:2.4~3.0kgf-m
Rear wheel axle nut:
Torque Value: 11.0~13.0kgf-m
To this chapter contents