EasyManua.ls Logo

Trane CenTraVac Duplex CDHF User Manual

Trane CenTraVac Duplex CDHF
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CDHF-SVU01C-ENX39640670030
Operation
Maintenance
Duplex CDHF, CDHG
Water Cooled CenTraVac
With CH530
Question and Answer IconNeed help?

Do you have a question about the Trane CenTraVac Duplex CDHF and is the answer not in the manual?

Trane CenTraVac Duplex CDHF Specifications

General IconGeneral
BrandTrane
ModelCenTraVac Duplex CDHF
CategoryChiller
LanguageEnglish

Summary

Warnings and Cautions

General Information

Unit Nameplate

Details about the unit nameplate and its sections.

Model Number Explanation

Breakdown of the chiller model number components and their meaning.

Commonly Used Acronyms

Alphabetical list of acronyms and their definitions used in the manual.

Cooling Cycle Description

Detailed explanation of the refrigerant cycle in cooling mode for duplex chillers.

Unit Control Panel (UCP)

Control Panel Devices and Unit Mounted Devices

Describes components housed in control panels and unit-mounted devices.

Tracer CH530 Chiller Controller

Overview of the Tracer CH530 controller, its features, and benefits.

Operator Interface

DynaView™ Main Processor

Explains the DynaView™ interface, its screen layout, and navigation.

Machine-Operating Mode

Details the top-level and sub-level operating modes displayed on the chiller.

Settings Tab Screens

Explains how to navigate and use the settings screens for adjustments.

Interprocessor Communication

IPC3 Definitions

Defines key terms related to the IPC3 protocol and bus management.

Control Panel Internally mounted devices

Identifies internal control panel devices by schematic designation number.

Control System Components

Control Panel Components Layout

Illustrates the layout of control panel components and their designations.

Control Sequence of Operation

Electrical Sequence

Explains the electrical sequence of operation for the chiller's control logic.

UCP and Wye-Delta Starter Control Circuits

Details the logic circuits for UCP and Wye-Delta starters in chiller operation.

Machine Protection and Adaptive Control

Momentary Power Loss (MPL) Protection

Explains how the system handles momentary power losses to protect the motor.

Current Overload Protection

Details how motor currents are monitored for overload and locked rotor protection.

Current Limit Protection

Explains the logic to prevent motor shutdown by limiting compressor current draw.

Evaporator Limit

Monitors evaporator refrigerant temperature to prevent low-temp trips.

Low Refrigerant Temperature Cutout

Protects the evaporator from freezing by monitoring low refrigerant temperature.

Restart Inhibit

Provides short cycle protection for the motor and starter.

Unit Startup

Daily Unit Start-Up Procedures

Provides a detailed procedure for daily unit start-up checks and actions.

Seasonal Unit Start-Up

Outlines the procedures for starting the unit after a period of shutdown.

Unit Shutdown

Daily Unit Shutdown Procedures

Provides the procedure for daily unit shutdown and post-shutdown actions.

Periodic Maintenance

Overview

Describes basic preventive maintenance procedures and recommended intervals.

Daily Maintenance and Checks

Lists daily checks for evaporator/condenser pressures and oil tank status.

Weekly Maintenance

Recommends completing daily procedures and checks weekly.

Every 3 Months

Recommends performing all recommended weekly maintenance procedures.

Oil Maintenance

Compressor Oil Change

Recommends oil and filter change intervals based on operating hours.

Oil Filter Replacement

Provides a step-by-step procedure for replacing the oil filter.

Maintenance

Other Maintenance Requirements

Lists various checks like motor winding resistance and tube inspection.

Lubrication

Details lubrication points for vane linkage and operators.

Refrigerant Charge

Procedures for handling refrigerant charge, recovery, and system preparation.

Leak Testing

Outlines the process for leak testing a chiller with a full refrigerant charge.

Cleaning the Condenser

Discusses condenser tube fouling and cleaning methods.

Cleaning the Evaporator

Describes the process and recommended frequency for evaporator cleaning.

Purge System

Unit Preparation

Steps required to prepare a unit for extended storage.

CentraVac Commissioning Checklist

I. PRECOMMISSIONING PROCEDURES

Procedures to prepare the unit for commissioning.

A. Pre-start Operations

Detailed checks and tests to be performed before initial startup.

Related product manuals