Vertiv | SmartAisle2 | User Manual 72
Installation
2.8. Installation of the Bridge system
Sl. No. Details of Equipment
1 Base
2 Server Cabinet
3 Network Cabinet
4 Access door
5 Top Plate
6 A/C Column
7 Distribution Cabinet
8 Strong wire passage groove
9 Power cable trunking; copper and fiber cable tray
10 Cabinet top wire groove
11 Control panel
The Bridge system installation comprises the IT racks entry holes, roof installation trunking, and the installation
of the cross channel trunking.