EasyManuals Logo
Home>Zephyr>Blower>CBE-1000

Zephyr CBE-1000 User Manual

Zephyr CBE-1000
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
www.zephyronline.com
3
Ins ta llation - External Blower
1. Remove and discard shipping brackets and wood support (attached to sides of motor and inlet collar). Fig. - 7
BEFORE INSTALLING , check to see if blower wheel turns freely and does not rub on motor brackets. Check damper door
to be sure it moves freely and spring returns door to closed position.
2. Provide 14” x 18” hole through the roof or wall as shown in Fig. - 2. For reference, location of 10” duct connection and
wiring connection is shown.
Fig-3
24"
30"
6"
2"
1 1/2"
Remove
Fig-7
Remove
Remove
Remove
3. Install blower on roof or wall, with discharge
(screened end) pointing down, according to
standard roong procedures.
NOTE: Front discharge edge should be on top
of shingles and rear and side edges under shingles.
Unit must be sealed between roof or wall and under
side of ange with roong mastic to prevent leaks.
For installation on a at roof, or roofs with pitch
of less than 1 1/2’ in 12”, install blower on curb
as shown in Fig. - 3. Position curb on sloping roof
with 2” dimension facing down slope. Position curb
on at roofs so that disc harge points away from
prevailing wind.
Fig-2
Top View
Down Slope
of
Roof or Wall
14"
18"
4 1/2"
7 3/4"
10 1/2"
1 1/2"

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr CBE-1000 and is the answer not in the manual?

Zephyr CBE-1000 Specifications

General IconGeneral
BrandZephyr
ModelCBE-1000
CategoryBlower
LanguageEnglish