Start-up and operation
Contents of this chapter
This chapter describes the start-up procedure of the PVS-100/120 medium voltage compact
skid (MVCS) and the general operation criteria.
WARNING!
Only an authorized electrician is permitted to install the cabling to the MVCS. Obey
the Safety instructions (page 9) and the local safety regulations. If ignored,
physical injury or death, or damage to the equipment may occur.
WARNING!
Do not do electrical installation work during a thunderstorm.
Tools needed
Voltage detector
Insulation resistance meter. For more information, see section Measuring the insulation
resistance of the cabling (page 42).
Personal protective equipment
Prerequisite
WARNING!
Use original silica gel bags only during transport. Install new silica gel bags for
storage.
1. Remove the transportation covers.
8
Start-up and operation 49

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVS-100 Series and is the answer not in the manual?

ABB PVS-100 Series Specifications

General IconGeneral
BrandABB
ModelPVS-100 Series
CategoryInverter
LanguageEnglish

Related product manuals