EasyManuals Logo
Home>Ansul>Industrial Equipment>AUTOMAN II-C

Ansul AUTOMAN II-C User Manual

Ansul AUTOMAN II-C
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
MAINTENANCE
UL R5998 6-16-95 Page 7
MAINTENANCE
The ANSUL AUTOMAN II-C release is a mechanical device.
It requires periodic care. Maintenance, to provide maximum
assurance that your release will operate effectively and safe-
ly, should be conducted at regular intervals, not more than
six-months apart, or when specifically indicated by an
inspection.
1. Remove ring pin from STRIKE button and open enclo-
sure.
2. Insert ring pin as shown in Figure 9.
3. Remove cartridge and install safety shipping cap.
4. Perform steps 2 through 4 in the “TEST OF WIRING”
section on page 5.
5. Perform steps 1 through 11 in the “TEST ACTUATION
OF FIRE SUPPRESSION SYSTEM” section on page 5.
6. Perform the “SOLENOID CHECKOUT PROCEDURE”
on page 6.
7. After all fire suppression system maintenance proce-
dures have been completed, place the system back into
service by following steps 1 through 4 in the “ARMING
THE SYSTEM” section on page 6.
8. Record date of maintenance examination.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ansul AUTOMAN II-C and is the answer not in the manual?

Ansul AUTOMAN II-C Specifications

General IconGeneral
BrandAnsul
ModelAUTOMAN II-C
CategoryIndustrial Equipment
LanguageEnglish