FOR MODELS: JGW, JGR AND JGJ
1/01 PAGE 3 - 1
SECTION 3 - START UP
General
To ensure proper start up, it is important to carefully follow the Start Up Check List
provided in this section. It is also important that the operator be thoroughly familiar
with this manual and with the Packager’s Operating Manual.
CAUTION
BEFORE STARTING A NEW COMPRESSOR, OR AFTER RE-
LOCATING OR RE-APPLYING A COMPRESSOR, OR AFTER
MAJOR OVERHAUL, BE SURE TO COMPLETE AND CHECK
OFF ALL THE ITEMS ON THE START UP CHECK LIST ON
PAGES 3-2 THROUGH 3-4. THIS LIST IS DESIGNED TO
ENSURE MAXIMUM SAFETY IN STARTING AND OPERATING
THE COMPRESSOR
CAUTION
FOR SAFE OPERATION, DO NOT ATTEMPT TO START-UP
THE UNIT WITHOUT BEING COMPLETELY KNOWLEDGABLE
ON THE INFORMATION CONTAINED IN THIS SECTION. IT IS
ALSO ESSENTIAL TO REFER TO THE PACKAGER’S OPER-
ATING MANUAL.
!
!