3. COMMISSIONING
3.1. INITIAL PREPARATION
MTS (GB) Limited suppor
t the initiative. Within the
information pack you will find a copy of the Log Book.
It is important that this is completed in the presence of your
customer, they are shown how to use it, and it is signed by them.
Please instr
uct your customer that they must have their
Log Book with them whenever they contact a service
engineer or us
.
Preliminary electrical system checks to ensure electrical safety
m
ust be carried out by a competent person i.e. polarity, earth
continuity, resistance to earth and short circuit.
FILLING THE HEATING SYSTEM:
Remove the panels of the case and lower the control panel
(see section 3.2. for further information).
Open the central heating flow and return cocks supplied with
the connection kit.
Unscrew the cap on the automatic air release valve one full
turn and leave open permanently.
Close all air release valves on the central heating system.
Gradually open valve(s) at the filling point (filling-loop)
connection to the central heating system until water is heard to
flow, do not open fully.
Open each air release tap starting with the lowest point and
close it only when clear water, free of air, is visible.
Purge the air from the pump by unscrewing the pump plug
and also manually rotate the pump shaft in the direction
indicated by the pump label to ensure the pump is free.
Close the pump plug.
Continue filling the system until at least 1 bar registers on the
pressure gauge.
Inspect the system for water soundness and remedy any leaks
discovered.
FILLING OF THE D.H.W. SYSTEM:
Close all hot water draw-off taps.
Open the cold water inlet cock supplied with the connection kit.
Open slowly each draw-off tap and close it only when clear
water, free of bubbles, is visible
GAS SUPPL
Y
:
Inspect the entire installation including the gas meter
, test f
or
soundness and purge, all as described in BS 6891:1988.
Open the gas coc
k (supplied with the connection kit) to the
appliance and chec
k the gas connector on the appliance f
or
leaks
.
Water Treatment
The boiler is equipped with an aluminium alloy main heat
exchanger.
The detailed recommendations for water treatment are given in
BS 7593:1992 (Treatment of water in domestic hot water central
heating systems); the following notes are given for general
guidance:
-
If the boiler is installed in an e
xisting system, an
y
unsuitableadditives must be removed;
- Under no circumstances should the boiler be fired before
thesystem has been thoroughly flushed;
the flushing
procedure m
ust be in line with BS7593:1992.
We highly recommend the use of a flushing detergent
appropriate for the metals used in the aluminium alloy circuit.
These include (F
er
no
x Superfloc
, BetzDearbor
n Sentinel
X300 or X400 or Salamander System Cleanser), whose
function is to dissolv
e any foreign matter that may be in the
system;
In hard w
ater areas or where large quantities of w
ater are in

Other manuals for Ariston Type C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ariston Type C and is the answer not in the manual?

Ariston Type C Specifications

General IconGeneral
BrandAriston
ModelType C
CategoryBoiler
LanguageEnglish

Related product manuals