AUX DC Inverter Free Match 50HZ R32
192
◇When finish installation please carry out the drainage test to ensure that the water flow
through the pipeline fluently, and carefully observe the junction to ensure that there is no water
leakage at the junction. If the unit is installed in the newly built house, strongly recommend that
this test taken before the CFiling installation. Even it is the heating only unit, this test is
unavoidable.