p.6
and part catcher. Move the beak and part catcher
aside to easily access the bulk of the machine with
the hand truck.
Step 3: Use either the hand truck or the help of
two additional people to remove the machine from
the shipping crate and place it in the general area
where it will be assembled.
Dismantling the Support Leg
Step 1: Using the ratchet and 3/4 inch socket
attachment, remove the bottom 3/4 inch bolt
underneath the end of the rail where it is secured
to the support leg. (Save this bolt along with the
nut for Assembling the New Rail: Step 1.)
Step 2: Switch to the 9/16 inch
socket and remove the top two
remaining 9/16 inch bolts.
Now, remove the support leg
and retrieve the new rail from
the shipping crate at this
point.