Air-Cooled Liquid Chillers
Nominal cooling capacity 163-760 kW
50 Hz
Installation, operation and maintenance instructions


Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Carrier AquaSnap 30RB 182 and is the answer not in the manual?

Summary

Introduction to 30 RB Chiller Installation and Operation

Critical Safety Precautions for Installation

Essential safety guidelines to prevent injury and damage during installation.

Unit Moving and Site Selection Guidelines

Pre-Start-up Installation Checks

Final verification steps before commissioning the refrigeration system.

Electrical Data for 30 RB Chillers

Unit Application Data and Operating Ranges

30 RB Unit Operating Ranges

Defines the operational limits for evaporator and condenser for different units.

Electrical Connection Guidelines

Power Supply Requirements and Warnings

Guidance on power supply voltage, phase imbalance, and warranty implications.

Water Connection Guidelines and Precautions

System Water Flow Control Procedures

Procedure for Water Flow Rate Adjustment

Step-by-step guide to adjust water flow using control valves.

Pump Pressure vs. Flow Rate Curves

Graphs illustrating pump performance characteristics for different models.

Overview of Major System Components

Standard Maintenance Procedures and Schedules

Level 1 User Maintenance Tasks

Basic checks and simple maintenance tasks performable by the user.

Level 2 Technician Maintenance Tasks

Recommended maintenance requiring specific technical skills.

30 RB Chiller Start-Up Checklist

Pre-Start-Up Equipment Verification

Checklist for verifying the unit's condition and installation before start-up.

Unit Start-Up Procedure

Steps to follow for safely starting the chiller after all checks are complete.

Evaporator Water Loop Inspection

Checks related to the water loop volume, inhibitor, and pressure drop.

Summary

Introduction to 30 RB Chiller Installation and Operation

Critical Safety Precautions for Installation

Essential safety guidelines to prevent injury and damage during installation.

Unit Moving and Site Selection Guidelines

Pre-Start-up Installation Checks

Final verification steps before commissioning the refrigeration system.

Electrical Data for 30 RB Chillers

Unit Application Data and Operating Ranges

30 RB Unit Operating Ranges

Defines the operational limits for evaporator and condenser for different units.

Electrical Connection Guidelines

Power Supply Requirements and Warnings

Guidance on power supply voltage, phase imbalance, and warranty implications.

Water Connection Guidelines and Precautions

System Water Flow Control Procedures

Procedure for Water Flow Rate Adjustment

Step-by-step guide to adjust water flow using control valves.

Pump Pressure vs. Flow Rate Curves

Graphs illustrating pump performance characteristics for different models.

Overview of Major System Components

Standard Maintenance Procedures and Schedules

Level 1 User Maintenance Tasks

Basic checks and simple maintenance tasks performable by the user.

Level 2 Technician Maintenance Tasks

Recommended maintenance requiring specific technical skills.

30 RB Chiller Start-Up Checklist

Pre-Start-Up Equipment Verification

Checklist for verifying the unit's condition and installation before start-up.

Unit Start-Up Procedure

Steps to follow for safely starting the chiller after all checks are complete.

Evaporator Water Loop Inspection

Checks related to the water loop volume, inhibitor, and pressure drop.

Carrier AquaSnap 30RB 182 Specifications

General IconGeneral
Model30RB 182
TypeAir-Cooled Chiller
Cooling Capacity182 kW
RefrigerantR-410A
Compressor TypeScroll
Power Supply400V/3Ph/50Hz