Figure 1: Cisco ASR 9010 Router Packaged on a Shipping Pallet
A fully equipped router with six power modules can weigh as much as 375 lbs (170.5 kg); an empty chassis
weighs 150 lbs (67.8 kg). The chassis is designed to be lifted by two persons after you remove some of the
components, such as line cards, power supplies, and the fan tray, to reduce the weight before lifting the chassis.
See Removing Components Before Installing the Chassis, on page 20 for procedures to remove these
components.
Required Tools and Equipment
Before you begin the rack-mount installation, you must read and understand the information in the
Rack-Mounting and Air Flow Clearance Guidelines, page 1-24 , and have the following tools and equipment:
ESD-preventive wrist strap
Number 1 and number 2 Phillips screwdrivers
1/4-inch (6.35-mm) and 3/16-inch (4.5-mm) flat-blade screwdrivers
Tape measure
Level (optional)
Unpacking and Installing the Chassis
2
Unpacking and Installing the Chassis
Required Tools and Equipment

Table of Contents

Other manuals for Cisco ASR 9010

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco ASR 9010 and is the answer not in the manual?

Cisco ASR 9010 Specifications

General IconGeneral
BrandCisco
ModelASR 9010
CategoryNetwork Router
LanguageEnglish

Related product manuals