EasyManuals Logo
Home>Cisco>Server>UCS C240 M3

Cisco UCS C240 M3 Service Note

Cisco UCS C240 M3
10 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8
Cisco UCS C240 M3 NEBS Server Service Note
OL-28629-01
NEBS GR-1089 Installation Caution and Rules
NEBS GR-1089 Installation Caution and Rules
The following information is derived from the NEBS GR-1089 specification, Electromagnetic
Compatibility and Electrical Safety—Generic Criteria for Network Telecommunications.
This content also appears in the Regulatory Compliance and Safety Information For Cisco UCS C-Series
Servers.
Caution The intrabuilding ports (Ethernet and serial) of the equipment or subassembly is suitable for connection
to intrabuilding or unexposed wiring or cabling only. The intrabuilding ports of the equipment or
subassembly must not be metallically connected to interfaces that connect to the outside plant (OSP) or
its wiring. These interfaces are designed for use as intrabuilding interfaces only (Type 2 or Type 4 ports
as described in GR-1089-CORE) and require isolation from the exposed OSP cabling. The addition of
primary protectors is not sufficient protection in order to connect these interfaces metallically to OSP
wiring.
The Cisco Unified Computing System (UCS) has AC power ports that are intended for deployments
where an external Surge Protective Device (SPD) is utilized at the AC power service equipment (see
the definition in National Electric Code).
The Cisco UCS is designed for a Common Bonding Network (CBN) installation.
The Cisco UCS can be installed in network telecommunication facilities or locations where the
National Electric Code applies.
An electrical conducting path shall exist between the product chassis and the metal surface of the
enclosure or rack in which it is mounted or to a grounding conductor. Electrical continuity shall be
provided by using thread-forming type mounting screws that remove any paint or nonconductive
coatings and establish a metal-to-metal contact. Any paint or other nonconductive coatings shall be
removed on the surfaces between the mounting hardware and the enclosure or rack. The surfaces
shall be cleaned and an antioxidant applied before installation.
The DC return connection to this system should remain isolated from the system frame and chassis
(DC-I).
The nominal DC operating voltage is –48 VDC.
The intrabuilding RJ-45 Ethernet ports of the equipment or subassembly must use shielded
intrabuilding cabling or wiring that is grounded at both ends.

Other manuals for Cisco UCS C240 M3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco UCS C240 M3 and is the answer not in the manual?

Cisco UCS C240 M3 Specifications

General IconGeneral
Processor cores8
Processor modelE5-2600
Processor frequency2.7 GHz
Number of processors installed2
HDD size2.5 \
RAID supportYes
HDD interface-
Optical drive typeNo
Total storage capacity300 GB
Maximum storage capacity- TB
Number of HDDs installed16
Memory slots24
Internal memory96 GB
Memory clock speed1866 MHz
Internal memory typeDDR3-SDRAM
Maximum internal memory- GB
USB 2.0 ports quantityUSB 2.0 ports have a data transmission speed of 480 Mbps, and are backwards compatible with USB 1.1 ports. You can connect all kinds of peripheral devices to them.
PCI Express x8 slots3
Chassis typeRack (2U)
Power supply650 W
Operating altitude0 - 3000 m
Non-operating altitude0 - 12000 m
Operating temperature (T-T)-40 - 70 °C
Storage relative humidity (H-H)5 - 93 %
Operating relative humidity (H-H)10 - 90 %
Harmonized System (HS) code84714100
Weight and Dimensions IconWeight and Dimensions
Depth712 mm
Width445 mm
Height87 mm

Related product manuals