9.5 Control check list
√ intervention frequency (months) 1612
1 presence corrosion X
2 panel xing X
3 fan xing X
4 coil cleaning X
5 bowl cleaning + sanitisation X
6 outow test X
7 air lters cleaning / inspection X
8 air ow rate measurement X
9 channelling: anti-vibration devices and fastenings check X
10 check of the xing and the insulation of the power lead X
11 check of the earthing cable X
12 electric panel cleaning X
13 termina closing, cable insulation integrity X
14 power supply voltage (vacuum and loaded) X
15 absorptions of the single electrical loads X
16 protective device test: pressure switches, thermostats, ow switches etc.. X
17 control system test: setpoint, climatic compensations, capacity stepping, water / air ow-rate variations X
18 control device test: alarm signalling, thermometers, probes, pressure gauges etc.. X
19 electrical heaters check - option X
20 water coil check - option X
9.6 Coil
$POUBDUXJUIUIFFYDIBOHFSGJOTDBODBVTFDVUT FBSQSPUFDUJWFHMPWFTUPQFSGPSNUIFBCPWFEFTDSJCFEPQFSBUJPOT
*UJTFYUSFNFMZJNQPSUBOUUIBUUIFCBUUFSZHJWFTUIFNBYJNVNUIFSNBMFYDIBOHFUIFSFGPSFJUTTVSGBDFNVTUCFDMFBOFEGSPNEVTUBOEEFQPTJUT
3FNPWFBMMJNQVSJUJFTGSPNUIFTVSGBDF
6TJOHBOBJS QSFTTVSFHVODMFBOUIF BMVNJOVNTVSGBDFPGUIF CBUUFSZ CF DBSFGVMUPEJSFDU UIFBJS JO UIFPQQPTJUF EJSFDUJPOPGUIFGBO BJS
NPWFNFOU
)PMEUIFHVOQBSBMMFMUPUIFGJOT PBWPJEEBNBHFT
"TBOBMUFSOBUJWFWBDVNODMFBOFSDBOCFVTFEUPTVDLJNQVSJUJFTGSPNUIFBJSJOQVUTJEF
7FSJGZUIBUUIFBMVNJOVNGJOT BSFOPUCFOUPSEBNBHFEJOUIFFWFOUPGEBNBHFTDPOUBDUUIFBVUIPSJ[FEBTTJTUBODFDFOUFSBOEHFUUIFGJOT
TUSBJHIUFOFEJOPSEFSUPSFTUPSFUIFJOJUJBMDPOEJUJPOGPSBOPQUJNBMBJSGM X
9.7 Condensation collection basin
%JSUPSTDBMFDBOHJWFSJTFUPDMPHHJOH
"MTPNJDSPPSHBOJTNTBOENPVMEDBOGMPV JTIJOUIFCPXM
*UJTWFSZJNQPSUBOUUPGPSFTFFQFSJPEJDBMDMFBOJOHXJUITVJUBCMFEFUFSHFOUTBOEFWFOUVBMMZEJTJOGFDUXJUITBOJUJTJOHQSPEVDUT
0ODFDMFBOJOHJTDPNQMFUFEQPVSXBUFSJOTJEFUIFCPXMUPDIFDLUIFSFHVMBSPVUGM X