7 Install drop cable
7.1 Using jacket strain relief
The instruction for the jacket strain relief is a separate document: TC-1468-IP Cable retention: jacket strain relief
(Mclip)
7.2 Prepare drop cable
N° Description Preparation
1 Jacket Remove the jacket with a distance of 90 cm +/- 2 cm (35.4 +/- 0.8 inches).
2 Tube Use the target line to indicate the transition zone from tube to fiber.
3 Fiber Route the fiber.
Attention: For the 48 splice configuration: cut all fibers to length!
page 6 / 11
© 2022 CommScope, Inc. All Rights Reserved