8
Step 4
Place the nut in the hexagon hole of the stand,
then insert the screw in other side and then
tighten it by the screw driver.
MOUNTING GUIDELINES
1. Install the wireless 5-IN-1 sensor at least 1.5m off the ground for better and more accurate wind
measurements.
2. Choose an open area within 150 meters from the LCD display Main Unit.
3. Install the wireless 5-IN-1 sensor as level as possible to achieve accurate rain and wind measurements.
4. Install the wireless 5-IN-1 sensor in
an open location with no obstructions
above and around the sensor for
accurate rain and wind measurement.
Install the sensor with the smaller end
facing the South to properly orient
the wind direction vane.Secure the
mounting stand and bracket (included)
to a post or pole, and allow minimum
1.5m off the ground.
This installation setup is for Southern
hemisphere, if the sensor install in
Northern hemisphere the smaller end
should point to North.
SOUTH
A. Mounting on pole (Pole Diameter 1"~1.3"
(25~33mm)
B. Mounting on the railing
CONSOLE
BACKUP BATTERIES INSTALLATION
1. Remove the battery door on the bottom of the main unit.
2. Insert a 3 new AAA batteries.
3. Replace the battery door.
4. Once the batteries are inserted, all the segments of the LCD will be shown.