EasyManuals Logo

Doosan A2300 User Manual

Doosan A2300
242 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #228 background imageLoading...
Page #228 background image
A Series Diesel Engine Engine Replacement and Testing 226
Adjust the length of the cable/rod to the mechanical
shut down lever so there is stop-to-stop movement.
Note : Make sure the air intake and exhaust pipe
connections are tight and free of leaks.
Fill the engine with the required amount of lubricating
oil.
6.5 Liters [1.85 gal]
Note : Check the oil level after the engine has run for
2 to 3 minutes. Oil held in the oil filter and oil
passages will cause the oil level in the oil pan
to lower.
Fill the cooling system with a mixture of 50% water
and 50% ethylene-glycol base antifreeze.
Refer to the equipment manufacture’s specifications
for radiator capacity.
Engine Only Coolant Capacity
3.0 Liters [0.7 gal]

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan A2300 and is the answer not in the manual?

Doosan A2300 Specifications

General IconGeneral
BrandDoosan
ModelA2300
CategoryEngine
LanguageEnglish

Related product manuals