9
Lifting Instructions
FAILURE TO FOLLOW THESE INSTRUCTIONS COMPLETELY WILL VOID WARRANTY.
1. Transporting unit to
Installation site: Always lift a unit
from the bottom for the purpose of
transportation. The station should
be received attached to a pallet for
this purpose. Never roll a station
or move it on its side.
2. No Ballast (to be poured in
place): If the concrete anchor is
to be poured while the station is
in place lift the unit by securing
straps to the eyebolts supplied on
the lower ange, as shown below.
Keep station oriented vertically to
avoid any damage. Only lift from
the eyebolts to put unit in hole, not
for moving any distance.
3. Precast Ballast: Never lift a
station that has a ballast attached
by any means except the rebar
hooks. The weight of the concrete
will damage the station if you
attempt to lift it from any part of
the station.