38
5. Transportation & installation
5.1. Transportation
•
tipping during transport.
•
•
•
of water to avoid damage.
5.2. Installation preparations
•
•
•
•
•
the unit.
5.3. Mounting Instructions
•
•
the wall.
•
•
•
•
•
•
•
any.
5.4. Electrical installation
ings.
5.4.1. Power supply
The phase order is subordinated.
5.4.2. Earth leakage circuit breaker (ELCB).
•
•
•
due to earth leakage.
5.4.3. Service switch
MH42 / MP42 BH4 / BP4 BH7
528
528
Fre
Motor
14.2 A 14.2 A 27 A
20 A 20 A 32 A
L1, L2,
4 x 2.5 mm² 4 x 2.5 mm²