3 Installation
Technical illustrations
The technical illustrations in this documentation
represent a size 2 (63-90 kW) wood chip boiler with the
fuel discharge on the left side.
The illustrations are equally representative for the
sizes of the PE-K pellet boiler range, and for boilers
with the fuel discharge on the right side.
Assembly and installation only by qualified
specialist personnel
The assembly and installation may be performed
by specialist personnel with the corresponding
qualifications only.
WARNING!
Switch off the electricity to the boiler via the mains
switch
Switch off the electricity to the boiler via the mains
switch. This prevents injuries caused by switching
the boiler on inadvertently.
WARNING!
Burns caused by hot parts
Even after the boiler has been switched off,
there will still be a danger of burns caused
by the cleaning and maintenance covers of
the combustion chamber and the heat
exchanger, and by the combustion chamber door.
These parts cool off more slowly, so they may still be
hot.
Allow the boiler cool off long enough, or wear
appropriate protective clothing.
Opening the insulation door
Removing the combustion chamber door
Open the combustion chamber door, lift it slightly and
detach it.