Initial Setup and Calibration
November 1999
3-5
nInitial Setup and Calibration Check List
Is Initial setup complete? If not, perform Initial Setup procedure on page
3-1.
Is calibration complete? If not, perform Auto Calibrate Travel procedure on
page 3-4.
Does the final control element correctly respond to a setpoint change and is it
stable? If not, perform Stabilizing or Optimizing Valve Response on page
3-4.
Final control element is ready to be placed on line.
j
j
j
3