EasyManuals Logo
Home>Growatt>Control Unit>ZigBee Module

Growatt ZigBee Module User Manual

Growatt ZigBee Module
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
1. When set PAN ID, if the dialog box displays Setting New PAN ID Failed, the
setting fails. Please click on Module Restart Connect, and then reset PAN ID
(refer to chapter4, step 3-7).
2. When read PAN ID, if the value box displays FF FE, the setting fails. Please click
on Module Restart Connect, and then reset PAN ID (refer to chapter4, step 3-
7).As an alternative method, you could change the value of the PAN ID and channel,
then reset the data logger and ZigBee Module.
3. As to the same one inverter, either wireless method or wired method could be
chosen as a monitoring scheme. If not, the data logger couldnt search inverters well.
6 FAQ
13

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Growatt ZigBee Module and is the answer not in the manual?

Growatt ZigBee Module Specifications

General IconGeneral
BrandGrowatt
ModelZigBee Module
CategoryControl Unit
LanguageEnglish

Related product manuals