Compatibility
The AQL-CHEM is compatible with all Hayward Aqua Rite Pro and Pro Logic pool
controls. An AQL-CL chemistry kit must be used with the Pro Logic if automatic
chlorine generation is desired. The AQL-CHEM is not compatible with Aqua Rite or
Aqua Logic controls.
Installation
Overview
Installing the AQL-CHEM requires the following steps:
Mounting the Probe Cell
Plumbing the Probe Cell
Installing ORP and pH probes
Wiring probes to Probe Cell communication box
Wiring the Probe Cell to the Aqua Rite Pro or Pro Logic
Wiring the pH Dispense Pigtail to the Aqua Rite Pro or Pro Logic
Configuring the Aqua Rite Pro or Pro Logic
Validating Operation
Establishing Maintenance Schedule
Materials Needed for Installation
7/16” drill bit
¼” NPT tap
Two small adjustable wrenches if side mounting to Aqua Rite Pro or Pro Logic
3/16” drill bit if side mounting to Aqua Rite Pro or Pro Logic
Deburring tool or file if side mounting
Tape and scissors if side mounting to Pro Logic (for drill template)
Mounting hardware if surface mounting (not side mounting)
Flex tubing cutter
Water-tight strain relief for dispense pigtail
Flathead screwdriver and mallet to remove knock-out and install strain relief
120VAC Ground Fault Circuit Breaker (GFCB) for powering 120VAC dispense
pigtail or 240VAC (GFCB) for powering 240VAC dispense pigtail
Extra wire, wire strippers, and wire nuts could be helpful in some installations
Any items that would be required for wiring and installation per local code
Before carrying out any part of the installation, be sure to shut off input power to the
Aqua Rite Pro or Pro Logic. Turn off the pool filter pump, water features and any other
related equipment. Relieve pressure from the pool filtration system.
Mounting the Probe Cell
The Probe Cell can be mounted directly on the side of the Aqua Rite Pro/Pro Logic or
mounted up to 15' away (limited by length of Probe Cell cable). The key to successful
Probe Cell installation is in the plumbing. A pressure differential is required to allow
clean, untreated water to pass through the cell and across the probes. Consider this
when looking for an ideal mounting location.
2
17

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hayward AQL-CHEM and is the answer not in the manual?

Hayward AQL-CHEM Specifications

General IconGeneral
BrandHayward
ModelAQL-CHEM
CategoryLighting Equipment
LanguageEnglish

Related product manuals