EasyManuals Logo
Home>HIKVISION>Switch>DS-3E2510P

HIKVISION DS-3E2510P User Manual

HIKVISION DS-3E2510P
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
- 13 -
4
Sending the normal phase of
the data
TXD2+
Output
5
Sending the paraphase of the
data
TXD2-
Output
6
Receiving the paraphase of
the data
RXD1-
Input
7
Receiving the paraphase of
the data
RXD2+
Input
8
Sending the paraphase of the
data
RXD1-
Input
The direct-through or cross network cable has the function of auto-identification, so the five
classes of direct-through/cross network cables can be used to connect other Ethernet devices.
3.4 Checkup after Installation
Before feeding power to start the switch, perform the following checkups after the switch is
installed:
If the switch is installed on the DIN rail, check whether the installation is strong.
If the switch is installed on the desk, check whether there is enough space for the switch to
discharge its heat and whether the desk is stable.
Check whether the connected power supply meets the power requirements of
the switch.
Check whether the grounding line of 8/24 switch is correctly connected.
Check whether 8/24 switch is correctly connected to other terminal devices.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HIKVISION DS-3E2510P and is the answer not in the manual?

HIKVISION DS-3E2510P Specifications

General IconGeneral
BrandHIKVISION
ModelDS-3E2510P
CategorySwitch
LanguageEnglish

Related product manuals