11
Installation preparation
To ensure that all installation steps are successfully completed,
as preparation, we recommend that you use the last page of the
booklet to sketch your garden.
6
1. Identify and mark location of the power socket.
2. Decide where you will place the docking
station (close to power socket).
3. Identify and mark any objects that are to be
excluded from the cutting area such as trees,
flower beds, ponds, slopes >27%. These will
need to be excluded with the perimeter wire
during the installation.
4. Identify and mark any narrow passages with
less than 135 cm.
Example:
Type A: Single Lawn (1 Docking Station)
A single lawn area where narrow passages are at least 135 cm wide.