Figure E-13 Installing grounding cables
Step 6: Install power cables.
Install power input cables, as shown in (1) and (2) of Figure E-14.
Install power output cables, as shown in (3) and (4) of Figure E-14.
HUAWEI NetEngine40E Universal Service Router
Hardware Description
E DPD300-4-12 Power Distribution Box, Dual-Two Inputs
Issue 01 (2015-08-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
741