EasyManuals Logo
Home>Isuzu>Engine>A-6BG1T

Isuzu A-6BG1T User Manual

Isuzu A-6BG1T
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #70 background imageLoading...
Page #70 background image
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
II
I
I
I
I
I
II
II
II
II
II
I
I
I
I
I
I
I
I
!
d-8 ENGINE ASSEMBLY II
.
@I
:
.
a
:
.
El
:
Use a dial indicator to measure the clearance between
the tappet and cylinder body tappet travelling bore.
mm (in)
1 Standard 1 Limit - I
Tappet and Tappet
Travelling Bore
0.020-0.054
01
Clearance
(0.001-0.002)
(O.dO4)
PUSH ROD
Use a filter gauge to measure the valve push rod run
out.
Roll the push rod along a smooth flat surface (illustra-
tion).
mm (in)
iI
I
-Limit ~ - ~~ -1
“,
,
Push Rod Run-Out 0.3
(0.012)
Rocker Arm Correction
Inspect the rocker arm valve stem contact surfaces for
ridge @ and scoring @.
If the surfaces have light ridge or scoring, they may be
honed with an oil stone.
If the ridge or scoring is severe, the rocker arm must be
replaced.
ROCKER ARM SHAFT AND ROCKER ARM
Inspect all disassembled parts for wear, damage and any
abnormalities.
Rocker Arm Shaft Outside Diameter
Use a micrometer to measure the rocker arm outside
diameter.
If the measured value is less than the specified limit, the
shaft must be replaced.
@
mm (in)
Rocker Arm Shaft
Diameter
Standard Limit
18.98-l 9.00
18.85
(0.747-0.749)
(0.743)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Isuzu A-6BG1T and is the answer not in the manual?

Isuzu A-6BG1T Specifications

General IconGeneral
BrandIsuzu
ModelA-6BG1T
CategoryEngine
LanguageEnglish

Related product manuals