English 23
1 Safety lock
2 Filling hole for water
3 Switch
4 Child lock
5 Carrying handle
6 Grid connection cable with mains plug
7 Indicator light (green) - grid voltage present
8 Steam boiler
9 Steam nozzle
10 Unlocking button
11 **Steam hose
12 Steam gun
13 Unlocking button
14 Steam connector
15 Spotlight nozzle
16 Round brush
17 Power nozzle
18 Manual nozzle
19 Manual nozzle microfibre cover
20 **Manual nozzle microfibre cover (2 x)
21 **Extension tubes (2 pcs)
22 Unlocking button
23 **Floor nozzle
24 Hook and loop fastener
25 **Micro fibre cloth
26 Measuring jug
** Optional
Initial Start-Up
During initial start-up, a small cloud of smoke may be
emitted from the steam nozzle. The appliance requires
a short run-in time. At the start, the steam output is very
irregular and damp, single droplets of water may even
leak out. The steam volume that leaks out increases
constantly until the maximum quantity has been
reached after approx. 1 minute.