EasyManuals Logo
Home>Kohler>Engine>Command CV25

Kohler Command CV25 Service Manual

Kohler Command CV25
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #32 background imageLoading...
Page #32 background image
24 690 07 Rev. HKohlerEngines.com32
Lubrication System
Installation
1. Apply pipe sealant with Teon
®
(Loctite
®
PST
®
592™
Thread Sealant or equivalent) to threads of switch.
2. Install switch into tapped hole in breather cover.
3. Torque switch to 4.5 N·m (40 in. lb.).
Testing
Compressed air, a pressure regulator, pressure gauge,
and a continuity tester are required to test switch.
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate continuity (switch
closed).
2. Gradually increase pressure to switch. As pressure
increases through range of 3-5 psi tester should
indicate a change to no continuity (switch open).
Switch should remain open as pressure is increased
to 90 psi maximum.
3. Gradually decrease pressure through range of 3-5
psi. Tester should indicate a change to continuity
(switch closed) down to 0 psi.
4. Replace switch if it does not operate as specied.

Other manuals for Kohler Command CV25

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler Command CV25 and is the answer not in the manual?

Kohler Command CV25 Specifications

General IconGeneral
BrandKohler
ModelCommand CV25
CategoryEngine
LanguageEnglish

Related product manuals