PART 1.05 QUALITY ASSURANCE
A. Qualifications:
1. Installer experienced in performing work of this section who has specialized in installation of work similar to that
required for this project.
2. Manufacturer Qualifications: Manufacturer capable of providing field service representation during construction and
approving application method.
B. Preinstallation Meetings: Conduct Pre−installation meeting to verify project requirements, manufacturer’s installation
instructions and manufacturer’s warranty requirements. Comply with Division 01 Project Management and Coordination
(Project Meetings).
PART 1.06 DELIVERY, STORAGE & HANDLING
A. General: Comply with [01 61 00 − Common Product Requirements] [_____].
B. Ordering: Comply with manufacturer’s ordering instructions and lead time requirements to avoid construction delays.
C. Packing, Shipping, Handling and Delivery:
1. Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.
2. Ship, handle and unload units according to manufacturer’s instructions.
D. Storage and Protection:
1. Store materials protected from exposure to harmful weather conditions.
2. Factory shipping covers to remain in place until installation.
Specifier Note: Include or remove following section as project dictates.
E. Waste Management and Disposal:
Specifier Note: ENVIRONMENT: The disposal of packaging waste into landfill site demonstrates an inefficient use of natural
resources and consumes valuable landfill space.
1. Separate waste materials for [Reuse] [And] [Recycling] [_____] in accordance with Section [01 74 19 −
Construction Waste Management and Disposal] [_____].
2. Remove from site and dispose of packaging materials at appropriate recycling facilities.
3. Collect and separate for disposal [Paper] [Plastic] [Polystyrene] [Corrugated cardboard] [_____] packaging
material [In appropriate onsite bins] [_____] for recycling.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 01 Closeout Submittals
(Warranty).
PART 1.07 WARRANTY
A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
B. Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard warranty document executed by
authorized company official. Manufacturer’s warranty is in addition to, and not a limitation of, other rights Owner may have
under Contract Documents.
Specifier Note: Coordinate paragraph below with manufacturer’s warranty requirements.
C. Warranty: Commencing on Date of Installation.
1. Compressor: Five years (limited) (non−residential applications)
2. Other Covered Components: One year (limited) (non−residential applications)