EasyManuals Logo
Home>Manitowoc>Ice Maker>CVDT1200

Manitowoc CVDT1200 User Manual

Manitowoc CVDT1200
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Part Number 000014141 Rev 07 2/20 13
Installation
Location Requirements
The location selected for the ice machine
head section must meet the following
criteria. If any of these criteria are not met,
select another location.
The location must be indoors and
must be free of airborne and other
contaminants.
The location must not be near heat-
generating equipment or in direct
sunlight.
The location must allow enough
clearance for water, drain, and electrical
connections in the rear of the ice
machine.
The location must not obstruct airflow
through or around the ice machine.
Installation Requirements
The ice machine and bin must be level.
Vent the ice machine and bin drains
separately.
Bin drain termination must have an air
gap.
The ice machine and bin must be
descaled and sanitized after installation.
The drain line must contain a union or
other suitable means of disconnection at
the ice machine.
QuietQube Models Only
The ice machine top panel can be
trimmed with an aviator snips to allow
the line set, water line and electrical
connections to exit the top. Only cut out
what is needed, the back panel must
support the top panel.
The water inlet and electrical connection
must contain a service loop to allow
future access.
Section 2
Installation

Other manuals for Manitowoc CVDT1200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc CVDT1200 and is the answer not in the manual?

Manitowoc CVDT1200 Specifications

General IconGeneral
BrandManitowoc
ModelCVDT1200
CategoryIce Maker
LanguageEnglish

Related product manuals