Connect the Line Set
Ice Machine
The line set can be routed for entry through the top or rear of the
ice machine head section.
³ Top routing requires the cover to be trimmed.
³ Rear routing may require the use 90° elbows on some
models.
The line set shut off valves at the back of the ice machine must
remain closed and be protected from heat during the brazing
process. Wrap the valves in a wet rag or other type of heat sink
prior to brazing. Cool braze joint with water immediately after
brazing to prevent heat migration to the valve.