54 55
A Open HARDWARE FOR STEP 1.
B Gently lift up top HAND RAIL (1) and align with MAIN FRAME (2).
C Remove the wire tie from the MAIN FRAME (2).
D Attach TOP HAND RAIL (1) to MAIN FRAME (2) using 1 BOLT (A), 2 flat
WASHERS (B), and 1 NUT (C) and tighten to 45.9 Nm / 33.9 lb-ft.
E Attach TOP RAIL BRACKET (3) to TOP HAND RAIL (1) using 2 SCREWS (D).
F Attach HAND RAIL COVERS (4) using 6 SCREWS (D) and 4 FLAT WASHERS (E).
1
A50 SHOWN
Hardware For Step 1
Description Qty
A
B
C
D
E
Bolt
Flat Washer
Nut
Screw
Flat Washer
1
2
1
8
4
ENGLISH
A50
ENGLISH
UPPER HANDLEBAR
RESISTANCE/INCLINE TOGGLES
PULSE GRIPS
WATER BOTTLE HOLDER
TOP HAND RAIL
SWING ARM
FOOT PADS
LINK ARM
CONSOLE
CONSOLE MAST
TOP CAP
LOWER HANDLEBAR
CRANK
POWER CORD SOCKET
PEDAL ARM
MXR20_AG_A30_A50_r1_1_B.indd 54-55MXR20_AG_A30_A50_r1_1_B.indd 54-55 12/3/20 2:41 PM12/3/20 2:41 PM