Service Manual_2018-V1.0
9
3. Installation and commissioning
3.1 Handling
1)Protect the refrigerator in moving it,Same as shown as
left photo, please move it by handcart with cushion
2)Remove all packing materials and bottom cushion, the
n move into house for placement
3)After moving it to appropriate location, wait for 2 hours
before power on.
3.2 Door Disassembly and Assembly
The refrigerator door needs to be dismantled if it cannot enter the room in the whole.
3.3 Installation location
Location that is easy for ventilation shall be chosen to
facilitate heat dissipation, enhance its performance and
reduce the energy consumption.
3.4 Leveling of the refrigerator
Leveling of the refrigerator