PDR 908 HP en-AU, NZ
= standard, = optional, + = only on request, - not available
11 276 500/05 7
Electrical connection (EL)
Standard voltage (AU, NZ)
Supply cable min. cross-section
Non-standard voltage MAR 230 (Marine)
Supply cable min. cross-section
Condensate drain hose (ASK)
Max. drainage temperature
On-site hose sleeve for drain hose
Drain hose (internal diameter)
Max. delivery head (from lower edge of machine)
Equipotential bonding (PA)
Appliance connection (separate kit required)
XCI-Box / XCI-AD interface
Peak load/energy management (SLA)
Appliance connection (with XCI-Box)
Payment system connection (KGA)
Connection of payment systems (with XCI-Box / XCI-AD)
Communication module (XKM)
Communication module XKM 3200 WL PLT
Installation on appliance feet (F)
Appliance foot, height-adjustable with thread
Anchoring of Miele plinths
Miele plinth installation (fasteners included)
Wood screws according to DIN 571
Wall plugs (diameter x length)
Plinth floor anchoring (to be provided on site)
Appliance installation on on-site base (concrete or masonry)
Min. plinth installation footprint (W/D)
Wood screws according to DIN 571
Wall plugs (diameter x length)