EasyManuals Logo
Home>NuTone>Ventilation Hood>RL6200 series

NuTone RL6200 series User Manual

NuTone RL6200 series
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #2 background imageLoading...
Page #2 background image
PRECAUCION
1. Solamente para uso general de ventilación. No utilice
para descargar materiales o vapores riesgosos o
explosivos.
2. Para evitar daños al motor y evitar que las navajas del
abanico emitan mucho ruido o estén fuera de balance,
mantenga el motor libre de pelusa, polvo, etc.
3. Para obtener mejores resultados en la captura de los
vapores de la estufa, el extractor debe montarse a entre
18 y 24 plg. sobre las hornillas de la estufa.
4. Por favor lea la etiqueta con las especificaciones del
equipo para otros requisitos y mayor información.
HERRAMIENTAS Y
MATERIALES QUE SE
NECESITAN PARA LA
INSTALACION
q Taladro, eléctrico o clavador de trinquete
q Taladro de 1/8 plg.
q Broca de 1-1/4 plg. para taladrar un agujero para la
entrada de los cables eléctricos
q Una cuchilla recta y un desarmador con punta (estrella)
phillips
q Pinzas
q Lapíz y regla o una cinta de medir
q Serrucho de punta o serrucho para cortar pedazos
de madera en 1 plg. por 2 plg. a la medida y para
hacer las aberturas en las paredes o en los gabine-
tes
q Remachadora, pedazos de metal, cinta para ductos,
ducto (si es necesario con codos y conexiones) y
recubrimiento de pared o techo, según sea necesario
q Cables eléctricos y materiales que sean aceptados
por las leyes locales
El siguiente material sólo se necesita si se va a instalar en
la parte inferior de un gabinete de cocina:
q Dos pedazos de madera con medidas aproximadas
de 1 plg. x 2 plg. x 12 plg.
q Cuatro tornillos para madera con cabeza plana de
1-1/4 plg.
PLANEANDO LA
WALL CAP
MODEL 647
CASQUETE
DE PARED
MODELO
647
7” ROUND DUCT
MODEL 407
DUCTO REDONDO
DE 7 PLG.
MODELO 407
DAMPER
MODEL BP87
REGISTRO
DE TIRO
MODELO BP87
TOOLS AND
MATERIALS REQUIRED
q Drill, electric or ratchet drive
q 1/8” Drill bit for drilling pilot holes
q 1-1/4” wood bit for drilling electrical wiring access
hole
q One straight blade and one phillips head screwdriver
q Pliers
q Pencil and ruler and/or tape measure
q Saber saw or keyhole saw for cutting 1” x 2” wood
strips to length and cutting wall or cabinet openings
q Caulking, metal snips, duct tape, duct (with elbows
and transition, if necessary) and roof or wall cap, as
required
q Electrical wiring and supplies of type to comply with
local codes
The following materials are required only for installations
on recessed bottom kitchen cabinets:r Ducted
q Two 1” x 2” x 12” (approximate length) wood strips
(purchase locally)
q Four 1-1/4” long flat head wood screws (purchase
locally)
FIG. 1
FIG. 2
ROOF CAP
MODEL 634
CASQUETE
DE TECHO
MODELO 634
2
PLANNING DUCTWORK
INSTALLATION
This section for RL6300 Series hoods only.
For RL6200 Series hoods, skip this section and go
on to “Prepare the Hood”.
Begin planning ductwork by deciding where the duct will
run between the range hood and the outside. For best
performance, use the shortest possible duct run and a
minimum number of elbows. There are several choices
shown - FIGS. 1 & 2 below.
FIG. 1
Sometimes when using a wall cap it is easier to duct
vertically and then use an elbow as shown.
Ducting between the ceiling joists (for multi-story instal-
lations) or through the soffit space above the cabinets
(where the soffit connects to an outside wall).
FIG. 2
Straight up through the roof using 7” round duct (for single
story installations).
INSTALACION DE LOS
DUCTOS
Esta sección es sólo para extractores Serie RL6300.
Si su extractor es Serie RL6200, sáltese esta sección
y continúe en la sección de “PREPARANDO EL EX-
TRACTOR”.
Inicie el plan para instalar los ductos decidiendo por dónde
va a pasar el ducto entre el extractor y la pared. Para ob-
tener un mejor funcionamiento, escoja la salida más directa
posible para el ducto, y el menor número de codos. Existen
diferentes opciones que se muestran en las FIGURAS A
y B enseguida.
FIG. 1
Algunas veces es más sencillo usar un casquete de pared
colocándolo verticalmente y usando un codo como el
mostrado.
Colocándolo entre las vigas del techo (para las instalaciones
múltiples) o a través de un espacio de plafón sobre los gabi-
netes (en donde el plafón se conecta a una pared externa).
FIG. 2
Utilizando un ducto circular de 7 plg. en posición vertical
(para instalaciones individuales ).
7” ROUND DUCT
MODEL 407
DUCTO REDONDO
DE 7 PLG.
MODELO 407
DAMPER
MODEL BP87
REGISTRO DE TIRO
MODELO BP87

Other manuals for NuTone RL6200 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NuTone RL6200 series and is the answer not in the manual?

NuTone RL6200 series Specifications

General IconGeneral
BrandNuTone
ModelRL6200 series
CategoryVentilation Hood
LanguageEnglish

Related product manuals